Compensate
World Economic ForumWorld Economic ForumWorld Economic Forum

Salido Kecil mini hydro power plant

Salido Kecil mini hydro power plant

Site Layout:

The proposed rehabilitation features the following general layout characteristics:

The proposed rehabilitation will optimize existing infrastructure and equipment, minimizing the need for imported equipment whilst ensuring a satisfactory level of performance is achieved. After a detailed assessment of a variety of options, refurbishment of the existing turbines and the installation of new generators and control equipment is clearly the most cost effective and profitable way of rehabilitating the plant and exploiting the hydraulic potential and existing infrastructure to its maximum.
The scheme’s efficiency and output will be increased significantly and operation and maintenance procedures will be simplified and optimised. The service life expectancy of the plant will reach >20 years.

Design Capacity Power Duration Curve and Annual Production:

The design capacity of one unit is 330 kW. The annual generation is calculated to be 2441 MWh with a mean production of 279 kW. After completion of the entire rehabilitation project, combined output of the three identical units is calculated to be 7323 MWh / year.

Project Measures:

The recommended rehabilitation project comprises the following measures:


 
For a detailed description of the compensation project download the Project Description as PDF-File (80kb).
 
For information about the project selection criteria see Project Selection.